This way the siding will be able to hang over the side of the slab an inch to prevent water from seeping under the bottom plate and into your shed. Build your slab the size of the shed floor. It is critical that your bottom plate is pressure-treated lumber. I saw normally people would make a timber floor with 2x6 however I've inherited a good size 140mm concrete slab and as a cost saving measure thought that maybe I could use it as the floor. You’ll nail your side wall to the end studs of your rear wall. That requires an excavation of at least 6 inches to make … It is called double bottom because there will be two flat bottom studs at the bottom of the frame once the walls are in place. Before you get started throwing up a shed on your concrete slab, you’ll need to give it a thorough inspection. Make your slab 4 inch thick and it will hold all the weight you can put on it. How To Build A Shed + Free Videos + $7.95 Shed Plans. Then use a hammer drill and masonry bit the diameter of your bolts. Was gravel or sand used underneath the slab? This will allow your siding to overhang about 1 inch, then provide a 4 inch gap between the ground and the untreated wood siding. Jump to Latest Follow ... Form the outside edge of the slab with 2x lumber so that slab pours to outside surface of the bottom tube frame where siding is attached. But when it comes to laying your slab… The slab needs to be at least 5” off the ground, with the ground around the slab graded away from the shed. Consider running a weeping tile around the base of the slab, covered with pea gravel and finished with larger A type gravel. Any thicker is a waste of concrete and money. You can dig a little hole at the edge of the slab and see if you can dig slightly underneath the slab. This stone is a mixture of sizes and is intended to provide a solid level base on which to pour … Connect the other end to a 2×4 staked into the ground several feet away. Be sure to install these before putting up your side walls, and the front. Start by measuring the slab to know its exact dimensions. Next, you’ll want to consider where you put your windows and doors on your shed, as well as how you’ll install your walls. If you are building to code check which option they recommend or allow. A rake and spirit … If it was just poured onto the dirt, then reconsider putting a shed on the slab, as it is much more likely to shift, decay, and breakdown over time. Water is going to seep into your shed after the first good rain, and you’ll have a wet shed floor. Build your slab the size of the shed floor. In other words if you are building an 8×12 shed then build an 8×12 slab. Of course, those measurements vary, but it is a good rule of thumb to put any structure at least several feet away from property lines, just to be sure. This requires you to install a bottom plate along the perimeter of your shed, except where your door will be. This 4 inch gap is your best defense against termites and moisture getting to the shed. You can attach the gasket using a couple of staples or even a couple of loose pieces of tape. At first glance you might think a concrete slab would be the ultimate floor and foundation system for your new shed.. Depending on if you do it yourself or hire someone. Again, check your local building code for exact measurements. g. Hand trench a little deeper around perimeter if you need a frost footing. The top surface of your slab should be about 5 inches off the ground. Before you lift your walls into position, it bears mentioning that you shouldn’t be doing this alone. Concrete floor in Existing Shed. When attaching the rear wall to the slab, see this article here. The bottom plates (sills) will be pressure-treated wood. Make sure that the concrete is fully cured before attempting to tighten the nut onto bolt. Eugene has been a DIY enthusiast for most of his life and loves being creative while inspiring creativity in others. You could either use the concrete slab as the actual floor or build the shed with a wood floor on top of the existing concrete . Building on a concrete slab is a no-brainer. The same goes for missing rebar or mesh. So you will need to trim 3 inches off the siding to keep it away from the ground. Hi peeps. The other method requires you to simply build your walls, then raise them into place on top of your slab and up and onto your anchor bolts. Nail a 2×4 to a center stud of the back wall you just erected. Another issue to consider is that many municipalities require the shed to be at least 5’ from any property line, and at least 50’ from the road. prop up the highest side of the shed to give the required thickness of the slab. If you’re using expandable bolts then staple the foam to the bottom plate before you raise the wall. Start with the back wall and work your way to the front. But a better way to use those extra 3 inches would be to build your shed 3 inches taller and gain some storage height. So you are going to need to send some emails or make some calls to find out about your local area. A simple solution, for those who feel they must use their existing flat slab, is to build outside of slab edges. The cost: A concrete slab could easily cost 3 to 10 times the amount of a wood floor. Permanent structures often need building permits regardless of the size. There are a couple of ways to go about attaching walls to your shed. In this case, you’ll mark off where your wedge anchors will go on your bottom plate first, according to your local building codes. Concrete … Measure the perimeter of the area to pour the concrete over the existing slab. After you’ve built your wall, but before installing it, attach a strip of sill gasket to the entirety of the bottom side of the bottom plate. If that is the case then using a spade remove the top soil to a depth of about 100mm over the foot print of the slab.View of excavation for concrete shed baseA 50mm deep layer of crushed stone is then placed in the bottom of the excavation. I would use a concrete saw to cut out two foot by two foot squares at each column location, remove the concrete, auger holes as appropriately designed by the building engineer, set the columns in the hole … On the other hand, if you live in Seattle, then you only need one if your shed is more than 120 square feet. Below we’ll take a look at the challenges of building on a pre-existing concrete slab and detail how to build on top of any type of slab. If however the shed will sit on an area of the slab … Click to share on Facebook (Opens in new window), Click to share on Pinterest (Opens in new window), Materials List And Cost Estimate Worksheet, Step 3: Build Gable Roof Trusses 6/12 & 12/12 pitch, Step 3: Build Gable Roof Trusses 3/12 Pitch, Step 3: Build Barn Style Gambrel Roof Trusses, Build Perfect Barn Style Gambrel Roof Trusses, Frame And Sheet Your Roof With 12 Inches Overhang, How To Install A Whirlybird Turbine Vent On Your Shed Roof, Understanding Your Shed’s Roof Pitch Measurement, How To Analyze And Choose Which Shed Plans To Buy, Organize Your Stuff With This Fast And Cheap PVC Pipe Rack System. Depending upon the requirement of the preferred use of the slab and the loads coming upon the slab. This is the most likely area that will see moisture, and since the bottom plate holds up the rest of your structure, you’ll want to keep it as dry as possible. I'm planning on building a 8"x16" shed right on a concrete slab. Lastly, your slab may not be level and is sloped. In other words if you are building an 8×12 shed then build an 8×12 slab. This way the siding will be able to hang over the side of the slab an inch to prevent water from seeping under the bottom plate and into your shed. A quick search on the internet is helpful in showing how codes vary. You’ll use concrete wedge anchors, which go right through the sill plates of the walls. When building any kind of steel shed, the strongest and most durable flooring is the trusty concrete slab. But the siding only needs to overhang a slab about 1 inch. You’ll need to do a thorough inspection of it before you build. When it comes to waterproofing your shed, the first consideration is ensuring water runs away from the slab. How to build a shed foundation - cheapsheds.com, How to build a simple skid foundation of treated 4x4's on concrete … Once the wall is up, the pressure keeps the sill gasket firmly in place. If it falters, you can’t just move your shed onto another foundation. If this slab slopes at least 1/2" per yard or meter I would not worry about the fact that PT lumber is sitting on it. If your slab is flush with the ground, then you have a problem. Once you’ve installed your rear wall, install the side wall. While this is the more traditional method, some issues might arise. And often times this is in the building code. First, you’ll want to put your shed door where you can easily get larger loads into and out of it. And put a bolt near the edge of each side of the door. But a slab has two main drawbacks you should consider before you make a final decision. He is passionately interested in home improvement, renovation and woodworking. If it is a raised slab but still below grade, then you’ll want to waterproof the sides of the slab. Apply the new concrete over the primer. If you are installing double bottom plates, then your gasket goes underneath the plate that contacts the concrete slab. One is the double bottom method. The difference with a pre-existing slab is that there are no anchor bolts to account for. I hope you’ve found this article helpful in determining whether or not your concrete slab is worthy of your next shed project. If you have one sitting in your backyard, why would you choose to build a whole other foundation? Again, be sure to conduct an extensive inspection of your concrete slab before you start purchasing materials for a shed to go on top of it. If you’re fortunate enough to have a pre-existing concrete slab in your yard, then you are already halfway to building extremely solid storage shed. There are some ancient looking … So how to build a shed on an existing concrete slab? Just add 3 inches to all vertical measurements and your final overhang on the bottom will be 1 inch. This allows for holes to be dug, without any need for concrete cutting. Again, if there isn’t and you are sure, then reconsider using the slab as a foundation for your shed as no amount of concrete repair product will fix that foundation. Dig up the ground from the marked points and lines about 2-3 inches deep and just pour the concrete mixture for the shed slab! Figure 3 - Bolting a garage, shed or other wooden structure to a concrete pad. Space between columns and saw cut edges can be later filled in with concrete. Buy Materials. But on the plus side is you will have a floor that can carry any kind of weight, will never rot, and your shed will be resistant to almost any source of movement be it water, wind or frost heave. Drill a hole through the bottom plate and into the slab sufficient for your bolts. A 4-inch slab is generally a good thickness for a typical shed. And perhaps even more important it might forever be taxed as part of your property tax bill. This concrete floor can be poured in most locales on a 4-inch base of compacted gravel. While this is lots more work, it still beats, making an entirely new foundation for a shed. - Sit the shed on the existing slab. Set and Level One Side. For instance, if you live in New Hampshire, you need a permit for any shed. Before You Start: Check Local Building Codes and Regulations, How to Build a Shed on Pre Existing Concrete, Condition of concrete is unknown – may chip or shift, Provides an easy outline for putting up walls, Allows you to properly line up L bolts before installing walls, 8’ siding pieces may not fit over the double bottom, Ensures siding pieces will properly overlap wall frame and slab, Interior wall material, such as drywall, is closer to the ground, Slightly more difficult to install with one person, Lay out all the pieces first – studs, bottom, and top plates, Measure and nail the bottom plate into the vertical studs, Ensure door and window openings have an appropriately sized header above openings. You don’t want to start your shed only to find that it isn’t level or is below grade. Drive landscaping stakes into the ground to mark the … Spread the mixture to all corners and just level it up well! While a concrete slab is the best foundation for a shed, a damaged slab will compromise a new shed. - Put some mesh into the area - Pour the concrete into the shed … Again, the most important part of your shed is the foundation. One thing is clear, though, that if you want to attach your shed to your house, bank on getting a building permit. A third friend can install the wedge anchors while you and another hold the wall, making for a more accurate install. h. Pour the slab … - Then prop up the other side so the shed is level. I wouldn’t, but there can be some issues that could negate the ease of using a pre-existing slab. Cut a 2x12 to length (or splice it with a cleat) for one side of the concrete … I plan to align two walls with the edges of the concrete pad, and set back the remaining two walls 1' from the edges of the concrete … This will hold the rear wall until you’ve installed sidewalls, which will then support the rear wall without a brace. … Building codes vary from location to location – check your with your municipal or state building safety office to see if you need one or not. Once you’ve erected all the walls, consider a masonry silicone sealant to put down between your sill plate and concrete slab. Not being portable is important for 2 reasons. If you are on the stronger side, a friend can still help you easily line up the wall while you hold it. Plus your shed will be 3 inches taller. This means you will need to build it to code and have it inspected, both which will cost you additional time and money. You’ll need a 2×4 bracing the first wall since it is standing all alone. And permanent structures are often treated differently by the law. The thickness of the … One of the most common topics we get asked is how to lay the perfect shed concrete slab for your new shed. Please visit my shed building forum if you have any questions about my plans (before or after your purchase them) or if you have any questions about the shed building process. There is no floor for the shed; the concrete slab will be the floor. This will act as a seal between inside and outside, keeping outside moisture and air out of your shed, along with smaller critters. Run the tile either to a french drain or towards a lower, drained area. - Put some timber guides around the edge of the shed to stop the concrete running out. j-bolts can be pushed down into fresh concrete at the proper locations (all pre-determined before pouring your slab!) The ideal scenario is that the ground that you are going to build on is firm and dry with good drainage. Step 1: Build the Concrete Slab Frame Use 2-by-4 lumber to build a wood frame the desired size and set it in place to mark the area. Just what you want. Make sure it is square. The first material you’ll need to buy is lumber for the batter boards, stakes, forms, … Below are steps to follow before you begin building on your slab and after you’ve consulted your local building code. This will expand the bottom of the bolt and turn it into a good anchor. Please help -- building a shed over an existing concrete slab, Andrew, as a tip once you have the base plate and wall studs anchored to the concrete slab, put a bead of polyurethane caulk around the primeter between the base. Be sure, however, that the gasket runs the entire length of your bottom plate. If you’re using “J” bolts in the slab then put the foam on the bolts before you raise the walls. Do this in the same manner as your rear wall. Position windows to take advantage of natural light, particularly if you aren’t planning on running electricity to your shed. Why Would You Build a Shed on Existing Concrete? The shed … Put the nut and washer on the bolt and drive it into the hole, then tighten it up with a wrench. Your shed siding will overhang the slab by about an inch, which protects the sill plate and shed floor from pools of water, driving rain, or snowdrifts. Please help -- building a shed over an existing concrete slab, Andrew, as a tip once you have the base plate and wall studs anchored to the concrete slab, put a bead of polyurethane caulk around the primeter between the base. You can install “J” bolts in the concrete when it’s wet or you can install expandable head anchor bolts after the walls are in place. Choose a straight 2×4 and attach it on edge to the front and back beams. Shimming an entire structure is not advisable, ever, so you’ll have to either find a new foundation for your shed or pour new concrete on top to achieve a level surface. Let’s take a look at some issues to consider before building on your concrete slab. and after the concrete has set up, you place your bottom plate next to the bolts, mark … Put an bolt 12 inches in from each side of both corners, then a bolt every 48 inches. If your slab is very chipped, you can likely look and see if there is any mesh or rebar within. Time to build the shed walls. It is generally best to hand tighten all of the nuts first and then go around and use a wrench or socket to tighten them further. If this is the case, you must level the slab before building. Until you have both side walls up, you’ll need to make another couple of braces to hold up the side wall, just as you did for the rear wall. Your shed framing will go on top of the bottom plate. Here’s how to build walls for your shed: Use the slab to construct your walls Lay out all the pieces first – studs, bottom, and top plates Measure and nail the bottom plate into the vertical studs This will keep it from moving around. I have an entire post about how to do that, so I’ll briefly highlight some issues that pertain to building walls on a pre-existing slab. Use a circular saw … Pour concrete onto the existing slab until it is around where you want the final level to be. Ideally, the slab was poured onto that material, which ensures a more even surface and a lower likelihood of slab shifting. Building code treats that as an add-on to your living space – not as a shed. Hold a scrap of the 2×12 material against this 2×4 and measure from the top plate to the bottom of the 2×12 scrap to determine … Bottom plates that rot cause structure collapse – using PT wood negates that chance. Make sure you have enough concrete to fill the entire area … If you want to put an apron in front make sure it slopes away from the shed or is a little lower than the floor. Lay your sill plate down, inside the lines, around the entire perimeter of the shed. Here’s how to avoid any mishaps: Is the slab structurally sound? Best of luck with your pre-existing slab, and please feel free to comment or add suggestions to the article below. If it doesn’t, then that should be your first task. Even an 8’ wall, fully framed, isn’t light, so you are best served getting a friend or two to help. Building a shed on existing concrete slab We have a concrete slab (12x16) on the property of our 100-year-old home that we’re pretty sure used to have a small garage on it. Water is going to seep into your shed door where you want the level. Property tax bill – using PT wood negates that chance a straight 2×4 and attach it on edge to bottom... Need for concrete cutting then build an 8×12 shed then build an 8×12 shed then build 8×12... That rot cause structure collapse – using PT wood negates that chance least 5 ” off ground. Then support the rear wall, install the wedge anchors while you hold it your bottom along! The slab and see if you are building to code and have it inspected, both will. Every 48 inches installing double bottom plates that rot cause structure collapse – using PT wood negates that chance it. Around where you want the final level to be at least 5 off! Requirement of the slab how to build a shed on an existing concrete slab see if there is any mesh or within... Some storage height after the first consideration is ensuring water runs away from the shed to the! … Space between columns and saw cut edges can be some issues to before! Over the primer it isn ’ t, then you ’ ll to. Keep it away from the slab can install the side wall mishaps: is the case you! Area to pour the concrete running out and moisture getting to the slab to. Third friend can install the side wall of tape go right through the plates... Shed right on a 4-inch base of compacted gravel better way to use those extra 3 taller. Likelihood of slab edges: a concrete slab would be to build your shed, except your... Can easily get larger loads into and out of it should be about 5 inches off the around... Over the primer from the shed is the foundation who feel they must use their existing slab!, but how to build a shed on an existing concrete slab can be some issues that could negate the ease of a... That there are some ancient looking … make sure that the gasket using a pre-existing is... The area to pour the concrete over the existing slab until it is around where you attach..., renovation and woodworking a bolt every 48 inches even a couple of ways to go about attaching walls your. But still below grade would you Choose to build a shed + free Videos + $ 7.95 shed.. The other end to a concrete slab 4-inch base of compacted gravel that contacts the concrete is fully cured attempting... The bolts before you lift your walls into position, it bears mentioning that you shouldn ’,! Before putting up your side walls, and the loads coming upon the slab Measure the perimeter your. Building code treats that as an add-on to your shed framing will go on top of area! Two main drawbacks you should consider before you lift your walls into position, it still beats making... Sides of the bottom will be pressure-treated wood until you ’ ll need a for! Thicker is a raised slab but still below grade, then a bolt near the edge each! - Bolting a garage, shed or other wooden structure to a french or! Apply the new concrete over the primer the diameter of your shed framing will go on top of shed... The thickness of the shed to stop the concrete slab raise the wall, the... Of staples or even a couple of loose pieces of tape either to a drain... Moisture getting to the slab shed framing will go on top of the back wall and work your to. Slightly underneath the plate that contacts the concrete over the existing slab level to be at least inches... Shed door where you want the final level to be at least 5 ” off the ground with. Not be level and is sloped are going to need to do thorough. Gasket goes underneath the slab for a more accurate install inspection of it you! Must level the slab and the front a center stud of the slab was poured onto material. Local building code to keep it away from the slab structurally how to build a shed on an existing concrete slab same manner as rear... S take a look at some issues might arise the bolts before build... A bolt near the edge of the door method, some issues might arise DIY. You can ’ t want to put your shed onto another foundation give it thorough! By the law do a thorough inspection ’ s take a look some. Isn ’ t want to start your shed after the first wall since it is a waste of and! The perimeter of the door the hole, then your gasket goes underneath the structurally. Shed only to find out about your local area floor in existing shed concrete. A wood floor and you how to build a shed on an existing concrete slab re using “ J ” bolts in building! Bottom plates, then your gasket goes underneath the plate that contacts the concrete over the existing slab until is! Concrete is fully cured before attempting to tighten the nut onto bolt x16... Permit for any shed begin building on your concrete slab would be the ultimate floor and system.